A Groundwork company - serving Fort Myers, FL
Full Bathroom Remodeling in Alva, FL | Groundwork Construction Co. of Fort Myers

Full Bathroom Remodeling in Alva - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Full Bathroom Remodeling in Alva, FL Usually Takes 3 to 5 Weeks and Runs $9,000 to $28,000

A full bathroom remodel in Alva means gutting the room down to the studs and subfloor, then rebuilding everything: new tub or shower, new vanity, new toilet, new flooring, new lighting, new ventilation, and usually new drywall. Most jobs take three to five weeks from demo day to final walkthrough, depending on how far you move the plumbing and whether the inspector’s schedule backs up. Call (844) 638-7249 for a free on-site estimate with line-item pricing, not a ballpark guess.

Call (844) 638-7249

What makes a project “full” rather than partial is the scope. If you’re replacing fixtures but leaving the walls and floor alone, that’s a refresh. If we’re stripping everything and sometimes reframing a wall or rerouting a drain line, that’s a full remodel, and it’s the only way to fix underlying water damage, failed waterproofing, or a layout that never worked. In Alva, where homes range from 1970s ranch houses to post-Ian elevated rebuilds, the starting condition of the subfloor and framing dictates a big chunk of the final cost.

How a full bathroom remodel happens, stage by stage

Every crew has its own rhythm, but the sequence for a full bathroom remodel is largely fixed by building code and the order materials go in. Here is how our team runs it in Alva, with realistic durations for each stage.

Stage 1: Demolition and rough assessment (days 1-2). We pull the vanity, toilet, tub or shower, flooring, and drywall. The homeowner makes zero decisions during demo except one: whether to stop and pivot if we uncover rot or termite damage that was not visible before. This is when we inspect the subfloor and studs. In Alva, where pre-Ian homes sat near grade and took river flooding, we sometimes find subfloor plywood that looks intact from above but is delaminating underneath. If that happens, we show you photos, give you a fixed price for the repair, and get approval before moving on. No change orders without your sign-off.

Stage 2: Rough plumbing, electrical, and framing (days 3-7). This is where the homeowner’s biggest decisions are already made: did you keep the toilet and shower in their original spots or move them? Relocating a drain or supply line adds at least two days and typically $1,500 to $3,500 depending on joist direction and access. Our plumber runs new supply lines and drain pipes, our electrician wires new circuits for the vent fan, sconces, and any heated-floor thermostat, and the carpenter reframes any walls that changed shape. The rough inspection happens here. Lee County requires a permit on any full bathroom remodel that opens walls and touches plumbing or electrical, and the inspector checks the rough-in before we close anything up.

Stage 3: Dry-in and waterproofing (days 8-14). New drywall goes up, seams are taped and mudded, and the shower or tub surround gets its waterproofing membrane. This step is non-negotiable and code-required. For a tiled shower, we apply a liquid-applied membrane or cement board with sealed seams. For a fiberglass or acrylic surround, the manufacturer’s flange and sealant system does the job. The homeowner picks tile, grout color, and fixture trim here if they have not already. Drywall finishing and waterproofing cure time together eat about a week. You cannot rush it, and any contractor who tells you otherwise is cutting corners that will cost you a gut job in five years.

Stage 4: Tile, flooring, and millwork (days 15-25). Tile goes in first, starting with the shower walls and floor, then the bathroom floor. After tile cures, the vanity and countertop are set, the toilet mounted, the mirror and lighting hung, and the baseboards installed. This is where the room starts looking like a bathroom again. The homeowner’s only job during this stage is to be available for a 10-minute walkthrough when the vanity is set: we want to confirm the height and placement feel right while we can still adjust. Our 730-Day Done Right Promise covers every inch of this work, from the tile layout to the cabinet door alignment.

Stage 5: Final trim, fixtures, and inspection (days 26-30, or longer if the inspector is booked). We install the showerhead, faucet, towel bars, and any glass enclosure. The final inspection is scheduled. Lee County inspectors check that the GFCI outlets, vent fan, and plumbing all meet current code. Once the permit is signed off, we do a final walkthrough with you and hand over a written closeout packet with the permit card, fixture warranty cards, and a care sheet for the tile and grout. The whole thing typically wraps in four to five weeks. A simple job where nothing moves can finish in three weeks. A job moving plumbing across a concrete slab in a post-Ian elevated Alva home can push six.

The choices that define your full bathroom remodel

You’ll pick every surface and fixture, and those choices move the cost more than any other single variable. No right or wrong answers here, just trade-offs that fit different households.

  • Tub-and-shower combo vs. walk-in shower vs. freestanding tub with separate shower. A standard 60-inch tub with tiled surround is the budget-friendly default. A walk-in shower with a curb and glass door costs more in tile and glass but is accessible and easy to clean. A freestanding soaker tub with a separate shower is the premium option, and it needs the floor space and plumbing for both fixtures.
  • Flooring: porcelain tile vs. luxury vinyl plank. Porcelain tile is the Alva standard: it handles humidity, cleans easily, and lasts decades. LVP is softer underfoot and faster to install but can swell if floodwater sits on it. For homes in the Caloosahatchee floodplain, we usually recommend tile with a waterproof crack-isolation membrane underneath.
  • Vanity: stock, semi-custom, or custom-built. A stock vanity from a brand like KraftMaid arrives in two weeks and fits a standard footprint. Semi-custom lets you choose door style, finish, and drawer configuration. Custom-built cabinetry matches the exact dimensions of an odd-shaped Alva bathroom, which matters in older ranch homes where nothing is square.
  • Countertop: cultured marble vs. quartz vs. natural stone. Cultured marble is an integrated sink-and-top unit that is affordable and seamless. Quartz resists staining and never needs sealing. Natural stone like marble or granite is beautiful but requires annual sealing and costs more to fabricate.
  • Fixtures and lighting. The spread between a contractor-grade faucet and a high-end Kohler or Delta fixture is a few hundred dollars per piece. Vent fan choice matters in Florida humidity: a Panasonic unit that moves 110 CFM costs more than a builder-grade 50 CFM fan, but it actually clears steam from the room.

What Full Bathroom Remodeling costs in Alva, FL

Full bathroom remodeling prices in Alva land between $9,000 and $28,000, with most projects settling around $14,000 to $18,000 for a standard 5×8-foot bathroom with mid-grade finishes and no plumbing relocation. The low end gets you a straightforward replacement in the same footprint with stock materials. The high end is a larger master bath with custom cabinetry, a tiled walk-in shower, heated floors, and plumbing moved to a new wall.

The variables that move the number are concrete and predictable:

Square footage and layout complexity. A 40-square-foot guest bath costs less than a 100-square-foot master bath with a water closet and two vanities. Every extra foot of tile, drywall, and trim adds labor and material.

Plumbing relocation. Keeping the toilet, sink, and shower where they are is the single biggest cost-saver. Moving any fixture across the room means breaking concrete or cutting joists, running new drain lines, and often upsizing the vent stack. This alone can add $2,000 to $5,000.

Existing condition. Alva homes that took river water during Ian sometimes have subfloor rot, corroded copper supply lines, or cast-iron drain pipes that have reached end of life. Replacing a rotted subfloor or a section of drain line is a repair, not an upgrade, but it has to be done before we build on top of it. We write a separate line item for any repair work uncovered during demo, with a fixed price, so you approve it before we proceed.

Material grade. The difference between a $400 stock vanity and a $2,800 custom double vanity is obvious. Less obvious: porcelain tile ranges from $3 per square foot to $15 per square foot, and installation labor is the same either way. Your material choices drive the budget up or down faster than any other factor you control.

Permit and inspection scope. A full bathroom remodel in unincorporated Lee County requires a building permit and a plumbing permit at minimum. Electrical and mechanical permits join the list if we add circuits or move a vent. Permit fees in Lee County typically run $200 to $600 on a single-bathroom job, and the inspections add coordination time to the schedule. We pull all permits, schedule all inspections, and hand you the signed permit card at closeout.

Every estimate we write in Alva includes line-item pricing with materials, labor, and permit fees broken out separately. You see exactly what costs what, and we guarantee the price will not change unless you change the scope. Call (844) 638-7249 to schedule a free estimate. It takes about 45 minutes at your home, and you’ll have a written quote within 48 hours.

What Alva homes specifically force us to account for

Alva sits directly in the Caloosahatchee River floodplain, and the housing stock here tells the story of Ian. We work on 1970s and 80s ranch homes on large lots that were built near grade and took river flooding in 2022, as well as post-Ian rebuilt homes elevated on stem walls and piers that are two to four feet above the original slab. Those two conditions could not be more different for a bathroom remodel.

In an older, at-grade Alva home, our first concern during demo is what the subfloor looks like. If the home took standing water during Ian and the floor was not fully replaced, we often find plywood that passes a visual check but fails a moisture-meter test. We also see copper supply lines with pinhole corrosion from years of mineral-heavy well water, which is common in the rural parts of east Lee County outside the municipal water grid. In a newly elevated home, the bathroom is effectively in brand-new condition structurally, but the flooring and drain rough-ins are sometimes set at slightly different elevations than the original plan called for, which means custom subfloor build-up or a step-up shower pan. Neither scenario is rare here. Both are specific to Alva in a way that does not apply to the Gulf-facing communities further west, where wind-rated construction dominates the conversation.

FEMA’s post-Ian flood map revisions have reclassified parcels along the river corridor, and Lee County now enforces elevation requirements on substantial improvements. If a full bathroom remodel triggers the county’s “substantial improvement” threshold (costing 50% or more of the structure’s pre-damage value), the entire home must be brought into current flood-elevation compliance. We flag this early in the estimate process so there are no surprises at the permit counter. Most single-bathroom remodels stay well under that threshold, but it is a conversation we have up front with every Alva homeowner.

For homeowners considering a full bathroom remodel as part of a broader renovation, this work frequently overlaps with a full Bathroom Remodeling in Alva plan that might also address a kitchen or addition. Our Bathroom Remodeling crew handles the tile, waterproofing, and fixture install, and we coordinate with the same plumber and electrician who work every job on this side of Lee County. Because Alva properties sit on large lots, homeowners sometimes pair interior work with exterior improvements. We have seen clients schedule Roof Repair in Alva alongside a bathroom gut job, particularly on older homes where a roof leak contributed to the bathroom ceiling damage. Others, especially on elevated rebuilds, use the project window to tackle a full Roof Replacement & Installation in Alva so the entire envelope is finished in one season. We cover Alva from North River Road to the Hendry County line and know the inspector’s rhythms and the soil conditions that affect foundation work here.

Serving Alva, FL - Our Local Coverage Area

We’re based in the Alva area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently asked questions about Full Bathroom Remodeling in Alva

Why Alva Chooses Groundwork Construction Co. of Fort Myers

We set the standard for full bathroom remodeling in Alva.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Alva

Getting your full bathroom remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Alva - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Alva Customers Say

Trusted by homeowners across Alva and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Bathroom Remodeling in Alva?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Alva.

(844) 638-7249

Request a Free Estimate in Alva

Tell us about your full bathroom remodeling needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch