A Groundwork company - serving Fort Myers, FL
Walk-In Showers & Shower Remodeling in Naples Park, FL | Groundwork Construction Co. of Fort Myers

Walk-In Showers & Shower Remodeling in Naples Park - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What Walk-In Shower Remodeling Really Costs and Takes in Naples Park

A true walk-in shower remodel in Naples Park usually means tearing out an existing tub or cramped stall and building a curbless, tiled shower that’s flush with the bathroom floor. Depending on the scope, the job runs from $4,500 for a straightforward shower-pan replacement up to $28,000 for a full wet-room build with moving plumbing, and most of our Naples Park projects are completed within 9 to 14 working days. Call us at (844) 638-7249 for a free on-site estimate and a line-by-line breakdown before you commit to anything.

Call (844) 638-7249

How We Take a Naples Park Shower from ‘Dated’ to ‘Done’

The process is not a mystery and it shouldn’t feel like one. Here is what happens, stage by stage, so you know exactly when decisions need to be made and when the tile saw stops running.

Stage 1: Demolition and Discovery (Day 1, sometimes into Day 2). We protect the floor path from the entry door to the bathroom with ram board and zip-wall off the work area to contain dust. The old shower pan, wall surround, valve, and trim get removed down to the studs and subfloor. On older Naples Park CBS homes built in the 1960s and 1970s, this is where we find what the original slab actually looks like underneath. Sometimes the drain is exactly where we need it. Sometimes the slab has a recessed shower pan that gives us the depth we need for a curbless entry without any concrete cutting. When it does not, that discovery triggers the next conversation about raising the pan or trenching the slab, and we walk you through the cost difference before a single tool touches concrete.

Stage 2: Rough-In Plumbing and Waterproofing Prep (Days 2-4). The shower valve gets upgraded (we standardize on pressure-balanced valves, usually plumbed with 1/2-inch PEX home runs), and the drain assembly is set at the precise height for the tile assembly that is going on top of it. If the layout changes the showerhead location or adds a hand-shower on an adjacent wall, the plumbing gets moved and pressure-tested now. The walls get shimmed flat and covered with a cement board substrate, taped, and floated. In Naples Park’s salt-heavy air, fastener selection matters more than people realize. We use corrosion-resistant screws rated for coastal exposure behind every board. Otherwise you end up with rust bleeding through grout in three years, and we are not interested in doing the job twice.

Stage 3: Waterproofing, Day of Truth (Day 5). This is the step that separates a shower that lasts 20 years from one that rots the wall cavity. We apply a full liquid-applied waterproofing membrane to the entire shower floor and walls up to the showerhead height at minimum, often to the ceiling on steam-shower builds, with mesh fabric embedded at all change-of-plane corners. If the job includes a linear drain across the back wall, the pre-slope floor mortar gets floated now to pitch 1/4 inch per foot toward the drain opening. The waterproofing has to cure, which gets us an overnight hold. You will choose your grout color and tile layout direction during this gap if you haven’t already locked it in.

Stage 4: Tile, Trim, and Glass Measurement (Days 6-9). The tile goes in floor-to-wall, or wall-to-wall, using a thin-set mortar rated for large-format tiles if that’s the look you chose. Penny tile mosaic floors take more labor. Large rectified porcelain panels go faster but require perfectly flat substrate work in Stage 2. Grout cures for 24 hours. Once the tile is set, we shoot precise measurements for the glass enclosure and place the order. The glass typically takes 7 to 10 days to fabricate, and we schedule the install for the day it is ready.

Stage 5: Final Fixtures, Glass, and Walk-Through (Days 10-14). The shower trim (the visible plate and handle you touch) gets installed, the door or fixed panel goes in, and we silicone every seam at the wall, the floor, and the glass to the tile. We run the shower for ten minutes to check slope, drainage, and valve function while you watch. Any splashing, any pooling, and we correct it before we call the job done. Your 730-Day Done Right Promise starts the day we walk out the door.

The Choices That Shape Your Shower

You will make about half a dozen tangible decisions. Here is what those decisions look like and why they matter to the final number on the estimate.

  • Curbless vs. curbed entry. A curbless, zero-threshold shower floor that sits flush with the bathroom tile is the most-requested option right now in Naples Park, particularly for homeowners planning to stay in their homes long-term. It requires enough vertical space under the slab to drop the shower pan or a raised bathroom subfloor. In a slab-on-grade CBS home where trenching the concrete is the only path, the additional labor pushes the cost toward the upper end of the range. A low-profile curb (2 to 3 inches) solves the elevation problem for about $900 to $1,600 less.
  • Shower pan: pre-formed vs. site-built mortar. A pre-formed, high-density foam shower pan with an integrated slope installs in a morning. A site-built dry-pack mortar pan takes a full day and gives us unlimited flexibility on drain placement and odd-shaped footprints (think a long rectangle with the drain at one end). The foam pan saves labor. The custom pan saves layout constraints. Both work. We use what the floor demands, not what’s easier to stock on the truck.
  • Wall tile material and size. Standard ceramic subway tiles in a running-bond pattern keep the cost at the floor of the shower range, around $4.50 to $7 per square foot for the material itself. Porcelain large-format panels (24×48 or larger) reduce grout lines but cost $11 to $18 per square foot and require a flatter wall to begin with. Natural stone, like Carrara marble, is beautiful in a Naples Park guest bath but demands sealing every 12 months in a shower that gets daily use. We will tell you which materials we would install in our own homes, given the hard water here.
  • Valve and fixture trim grade. A builder-grade single-handle pressure-balance valve costs roughly $80 to $140. A thermostatic valve that lets you set the exact temperature and turn on the water without touching the handle twice costs $300 to $600 and makes a difference every single morning. We install Kohler, Delta, and Moen trim packages most often. A rain head plus a wall-mounted hand-shower on a slide bar adds plumbed diverter lines and roughly $700 to $1,100 to the job total.
  • Glass configuration. A single fixed panel with no door starts around $900 for clear tempered 3/8-inch glass. A hinged door with a matching inline panel, fully framed, is $1,400 to $2,200 depending on width and coating choices. We almost always recommend a protective glass coating on the interior surface. Naples Park water spots glass fast and the coating earns its cost back in the scrubbing you won’t do.

What Walk-In Showers and Shower Remodeling Costs in Naples Park, FL

A walk-in shower remodel in Naples Park typically lands between $4,500 and $12,000 when the project is a direct shower replacement that does not move the drain, relocate the valve, or change the footprint. On the broader end, a full gut-and-redesign with moving plumbing, curbless entry, a custom bench, dual showerheads, and a steam generator can reach $22,000 to $28,000. Most jobs we write estimates for in this neighborhood settle between $8,500 and $14,000.

What pushes a project to the low end: keeping the valve and drain where they are, using a prefabricated pan, choosing standard-format wall tile, and framing a shower door that uses stock dimensions. What pushes it to the high end: slab trenching for a recessed pan, relocating the drain across the room, framing a knee wall for a glass return, upgrading to full-height natural stone with epoxy grout, and adding a steam generator with its own dedicated electrical circuit.

A written Groundwork Construction Co. estimate for Naples Park includes the tear-out and disposal, the rough plumbing within the shower footprint, the waterproofing assembly, the tile and setting materials for walls and floor, the valve trim and showerhead, the glass enclosure, job-site protection, and a final silicone week that makes sure nothing leaks. Our estimate spells out exactly what is incidental and what is not. A dump fee, for instance, is a line item, not a surprise change order. Permitting, if required by Collier County for the scope of work, is listed separately. If the scope grows into something that pulls in an electrician (a heated floor under the bathroom tile is a common one), that’s priced as a line item too. No bundled vagueness. Call us at (844) 638-7249 and you will get upfront pricing, a fixed number, the first time.

What Naples Park Homes Specifically Do to a Shower Remodel

Naples Park’s housing stock directly affects how we waterproof, how we pan, and how we permit a walk-in shower. The majority of the original homes here are single-story concrete block and stucco builds from the late 1950s to the mid-1970s, sitting on slabs poured at or near grade. That means two things matter in a shower remodel that would not matter as much in a newer, elevated home in Fiddler’s Creek or a wood-framed house in North Fort Myers.

First, the slab dictates the shower-pan design. In a recessed-pan home, we almost always have the 4-inch depression we need to set the pan below the finish-floor height, which makes a curbless entry relatively straightforward. In a flat-slab home built before 1975, we often run out of vertical room without saw-cutting the concrete, and that step triggers both a higher labor cost and a conversation about whether the existing slab reinforcement is adequate at the cut line. Second, the salt-air exposure from being a mile from Vanderbilt Beach accelerates fastener and trim corrosion to a degree that surprises people who’ve only remodeled inland bathrooms. Every screw driven behind the tile, every escutcheon plate on the wall, and every metal bracket in the glass-clip assembly is stainless steel or coated for coastal use. That is not an upsell. It is a minimum spec for a job that’s supposed to last.

Permitting in Collier County is a known quantity, but on the tight 50-by-100-foot lots along Naples Park’s numbered avenues west of Tamiami Trail, the combination of older slab homes and FEMA AE flood-zone designations means that even an interior remodel can draw scrutiny if the scope includes relocating a drain that ties into the under-slab sanitary line. We pull the permit when the code requires it and we handle the inspection scheduling so you do not have to chase the county. That’s part of Bathroom Remodeling in Naples Park work done by a crew that knows what the inspectors are actually looking for.

Serving Naples Park, FL - Our Local Coverage Area

We’re based in the Naples Park area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Walk-In Showers and Shower Remodeling in Naples Park

Get a Fixed Price on Your Walk-In Shower Remodel in Naples Park

A walk-in shower is something you use every morning, and a soggy grout line or a valve that scalds you is not something you tolerate. It gets fixed. Call Groundwork Construction Co. at (844) 638-7249 and we will schedule a free on-site estimate at your Naples Park home. We walk the space, take measurements, talk through the five decisions that drive cost, and hand you a line-item proposal, usually within two days. A live person answers the phone, 24/7, and every technician who shows up at your door is background-checked and in uniform. From foundation to finish line, we build showers that drain exactly right and stay watertight for decades.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Naples Park and Southwest Florida since 2014.

Why Naples Park Chooses Groundwork Construction Co. of Fort Myers

We set the standard for walk-in showers & shower remodeling in Naples Park.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Naples Park

Getting your walk-in showers & shower remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your walk-in showers & shower remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Naples Park - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local walk-in showers & shower remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Naples Park Customers Say

Trusted by homeowners across Naples Park and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Walk-In Showers & Shower Remodeling in Naples Park?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Naples Park.

(844) 638-7249

Request a Free Estimate in Naples Park

Tell us about your walk-in showers & shower remodeling needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch