A Groundwork company - serving Fort Myers, FL
Full Kitchen Remodeling in Island Walk, FL | Groundwork Construction Co. of Fort Myers

Full Kitchen Remodeling in Island Walk - One Written Price, No Change Orders

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What a Full Kitchen Remodel in Island Walk Actually Costs and Takes

A full kitchen remodel in Island Walk typically runs between $14,000 and $45,000 depending on square footage, appliance choices, and how much of the original DiVosta layout you want to keep. Most jobs take five to eight weeks from demo to final walkthrough, with the roughest patch being the week rough-in work is happening and there’s no usable kitchen at all. Call us at (844) 638-7249 and we’ll give you an exact number for your specific home, not a range from a brochure. Free estimates, no pressure, and a written price before you commit to anything.

Call (844) 638-7249

How We Take a Full Kitchen Remodel from Gut Job to Finished Room

Having done this hundreds of times in homes built exactly like yours, we’ve learned that the sequence matters enormously. Skipping steps or compressing the schedule to sound fast almost always backfires. Here’s how it actually goes when we remodel a full kitchen in Island Walk.

Stage 1: Demolition and Concrete-Core Discovery (Days 1-3)

Everything comes out: cabinets, counters, flooring, appliances, light fixtures. This is also when we open up walls to see exactly where the original DiVosta pours placed electrical and plumbing chases. In Island Walk’s solid poured concrete construction, there are no hollow wall cavities to re-route through later. If we find that moving the sink to the island means coring through eight inches of concrete and completely re-thinking the drain slope, we’d rather tell you before the cabinets are ordered, not after.

Stage 2: Rough-In and Structural Work (Days 4-15)

New circuits get run, plumbing moves happen, and any wall modifications get framed and drywalled. This is the noisy, dusty part and it’s also where a contractor who doesn’t understand DiVosta builds can really stall out. We core-drill every penetration with water suppression to keep dust down, and we schedule the rough-in inspection once all the mechanical work is visible and testable. The homeowner doesn’t need to be on-site for most of this stage, but you will need to lock in your backsplash tile choice and lighting trim by Day 10 so nothing waits on material lead times.

Stage 3: Drywall Repair, Priming, and Flooring (Days 16-24)

Once the inspector signs off on the rough-in, we close everything back up, float and sand drywall patches, prime the walls, and install the new floor. If we’re doing tile flooring, we build in an extra day or two for grout to cure fully before cabinet boxes go on top, since trapping moisture under millwork is a long-term problem nobody sees until it swells. This is also when any under-cabinet lighting wiring gets its final home run to the switch box.

Stage 4: Cabinet Set, Countertop Template, and Trimout (Days 25-40)

Cabinet installation usually takes three to five days depending on kitchen size, and we bring in the countertop templating crew as soon as the base cabinets are anchored and leveled. The gap between templating and slab fabrication, typically a week and a half here in Naples’ supply chain, is when we install door and drawer fronts, trim, crown molding, and sink hardware. Once the stone is on-site, the sink and faucet go in the same day so the plumber can make final connections immediately and we’re not sitting on a finished kitchen with no running water.

Stage 5: Backsplash, Appliances, and Final Punch-List (Days 41-50)

Backsplash tile goes up after the countertops are down, the range and dishwasher get hooked up, and the whole room gets a deep clean. We walk the kitchen with you line by line: doors aligned, drawers gliding, outlets all live, no grout haze on the stone. The final building inspection happens before we call the project closed, and our 730-Day Done Right Promise kicks in from the day we hand you the keys back.

The Spec Choices You’ll Make on This Job

Every full kitchen remodel involves a handful of big-ticket decisions that set the look, feel, and budget for the whole room. Here are the ones that matter most, with the honest trade-offs nobody likes discussing until it’s too late.

  • Cabinet Construction: Stock cabinets keep the budget lean, but you’re limited to set widths and finishes - fine for a rental-update, but tight on storage fit in a 1998 DiVosta kitchen. Semi-custom from a line like KraftMaid lets us adjust depth and reduce filler strips, which matters in these older floorplans where walls may have settled slightly out of square. Full custom cabinetry pushes the top of the range but lands you exactly what you want, including pull-outs built around the precise cookware you own.
  • Countertop Material: Laminate keeps you in the low $14ks but won’t hold up to Florida humidity over decades. Quartz, like Cambria, is non-porous and takes zero maintenance, making it the most popular choice in Island Walk by a wide margin. Granite costs a bit less but needs annual sealing. Marble looks stunning and etches the first time a lemon hits it - we tell every homeowner that before they choose it.
  • Island Configuration: A simple prep island with no sink or cooktop stays under $5,000 with mid-grade stone. Adding plumbing or a downdraft vent pushes it beyond $7,000 fast, and in an Island Walk home where the slab is continuous under the kitchen floor, that plumbing rough-in alone can add days of core-drilling and slab chasing to the schedule.
  • Appliance Package: Entry-level stainless suites run around $3,500; pro-style ranges and column refrigeration can triple that. If you’re considering an induction cooktop or a 36-inch pro range, tell us early so we size the electrical runs appropriately - adding a 50-amp circuit later means opening walls we already closed.
  • Flooring Underlayment and Flatness: After 25+ years on a Florida slab, many Island Walk kitchen floors have settled unevenly. If we’re laying large-format tile, the substrate has to be dead flat or the tiles will crack at the edges. That prep work isn’t optional and it’s one of the line items that separates a $14,000 bid from a $25,000 one.

What Full Kitchen Remodeling Costs in Island Walk, FL

We price full kitchen remodels in Island Walk between $14,000 and $45,000, with the bulk of our projects landing in the $22,000 to $32,000 range for a typical 150- to 220-square-foot DiVosta-built kitchen. Here’s what pushes the number one direction or the other.

Square footage is the starting point. More linear feet of cabinetry, more countertop slab area, more flooring - those scale almost linearly. Existing condition matters next. If the original 1998 electrical is still running on a single 20-amp small-appliance circuit, bringing the kitchen up to current Florida Building Code with dedicated circuits for the microwave, dishwasher, and counter outlets adds real cost before a single cabinet goes in. The biggest swing factor is whether you’re keeping the original layout. Moving the sink, relocating the range, or knocking down a wall to open the kitchen to the living area triggers structural engineering, concrete coring, and additional permits that can add $5,000 to $10,000 on their own. Material grade is the other half of the equation - a laminate countertop and stock cabinet package sits at one end, quartz slabs and soft-close full-extension drawers at the other.

Our estimates are written as line-item proposals so you see exactly what each decision costs. The quote includes material, labor, demolition, haul-away, and permit fees tied to the scope. It does not include structural changes or hazardous material abatement unless we’ve discussed them explicitly. Every estimate is free, and we don’t use change orders as a backdoor pricing strategy - the number you see is the number you’ll pay unless you add scope mid-project. That’s backed by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction.

What Island Walk Homes Specifically Do to This Job

Island Walk was built almost entirely by DiVosta Homes in the late 1990s through mid-2000s using their proprietary solid poured concrete method, not the hollow CMU block common across the rest of Collier County. That changes everything about a full kitchen remodel here. Where a Naples contractor can score a channel into a hollow block wall and fish a new electrical line in twenty minutes, we’re setting up a core drill with water suppression and spending hours making a single penetration through solid concrete. When a homeowner wants to move the sink to the island, we’re not just extending a pipe - we’re chasing into the slab, confirming drain slope across a longer run, and sometimes coordinating with a structural engineer if the new path crosses a post-tension cable. Contractors who don’t know Island Walk, FL have shown up expecting standard Florida block construction and left to rent core drills they didn’t budget for.

Island Walk’s network of lakes and canals also puts many lots in or adjacent to FEMA-designated flood zones, which means any kitchen remodel that expands the home’s footprint or relocates significant electrical loads triggers an elevation review under Collier County permitting. Since Hurricane Ian’s 2022 track, the building department has been especially strict about flood-resistant detailing, even on interior renovations that touch exterior walls. We pull permits on every full kitchen remodel, not because the county always requires them on a like-for-like replacement, but because the moment you move an outlet or touch the plumbing, you’re outside the exemption. Our team handles the permit set, the inspections, and the sign-offs, and we’ve done it enough in Island Walk that we know what the county is flagging this quarter before we even submit.

Serving Island Walk, FL - Our Local Coverage Area

We’re based in the Island Walk area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Full Kitchen Remodeling in Island Walk

Start With a Free Estimate for Your Full Kitchen Remodel in Island Walk

If you’re in Island Walk and you’ve been thinking about redoing your kitchen - whether it’s a full gut-and-replace or a same-footprint refresh with better cabinets and stone - call us at (844) 638-7249 for a free on-site estimate. Ask us about Impact Windows & Doors in Island Walk while we’re there. We’ll walk your kitchen, talk through what’s possible and what the DiVosta construction means for your scope, and hand you a written price that covers everything we discussed. No voicemail, no call-back queue. A live person answers, 24/7, and we’ll get you on the schedule at a time that works.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Island Walk and the surrounding communities with full-scope kitchen remodeling since 2014.

Why Island Walk Chooses Groundwork Construction Co. of Fort Myers

We set the standard for full kitchen remodeling in Island Walk.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Island Walk

Getting your full kitchen remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Island Walk - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Island Walk Customers Say

Trusted by homeowners across Island Walk and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Kitchen Remodeling in Island Walk?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Island Walk.

(844) 638-7249

Request a Free Estimate in Island Walk

Tell us about your full kitchen remodeling needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch