A Groundwork company - serving Fort Myers, FL
Garage Conversion ADU in Lely Resort, FL | Groundwork Construction Co. of Fort Myers

Garage Conversion ADU in Lely Resort - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What a Garage Conversion ADU in Lely Resort Actually Costs and How Long It Takes

A garage conversion ADU in Lely Resort turns an existing attached or detached garage into a self-contained living unit with its own entrance, kitchenette, bathroom, and sleeping area. Most projects we build here fall between $45,000 and $130,000, with the typical conversion running 10 to 16 weeks from the day we pull permits to final inspection. Call (844) 638-7249 for a free on-site estimate with a written line-item scope so you see exactly where every dollar goes.

Call (844) 638-7249

How We Convert a Garage Into an ADU in Lely Resort

The process is methodical because the building department checks every stage. Here’s what the sequence looks like on a typical Lely Resort garage conversion, based on the CBS block construction we work with in this community day in and day out.

Stage 1: Survey, As-Builts, and ARB Submission (Weeks 1-3). Before any tool touches the garage, we pull existing-condition measurements and submit architectural drawings to both Collier County and the Lely Resort Architectural Review Board. The ARB reviews exterior changes - any new door or window openings, the finish and profile, paint color - against the community’s approved palette for your sub-association. This dual-track approval is the single biggest timeline variable in Lely Resort. You decide the floor plan layout, window and door placement, and exterior finish during this stage.

Stage 2: Demo, Slab Prep, and Rough Openings (Weeks 3-5). Once the permit card is posted, we strip the garage interior to the block shell - removing the door, opener, and any drywall. The existing slab gets evaluated for flatness, crack repair, and moisture vapor transmission. Because Lely Resort sits on a coastal plain where the wet-season water table can rise within 18 to 24 inches of grade, we test slab moisture before committing to flooring assemblies. We cut new rough openings for windows and the entry door, and the plumbing trench is saw-cut into the slab for the bathroom and kitchenette drain lines.

Stage 3: Rough-In - MEP, Framing, and HVHZ Openings (Weeks 5-8). Plumbers stub out supply and drain lines. Electricians run the subpanel feed, branch circuits, and can lights. The mini-split HVAC line set gets routed. This is when we install impact-rated windows and doors that meet Florida’s High-Velocity Hurricane Zone requirements - a non-negotiable cost driver on every permitted ADU in Collier County. Interior partition framing goes up, and the bathroom gets a pre-slope and waterproofing before the shower pan is poured. You’ll choose fixtures and finishes by the end of this stage so materials are on-site for trim-out.

Stage 4: Insulation, Drywall, and Close-In (Weeks 8-11). Closed-cell spray foam goes into the block wall furring cavities and ceiling joists - we spec this over batts in Lely Resort because the vapor-closed cell structure handles southwest Florida humidity better. Drywall is hung, taped, and textured. The bathroom gets cement board and a waterproof membrane. Exterior stucco patch and paint are matched to the ARB-approved color for your sub-association. At rough-in inspection, the county checks the mechanical, electrical, plumbing, and framing before we close walls.

Stage 5: Trim, Fixtures, Flooring, and Final Inspection (Weeks 11-16). Cabinets, countertops, trim, doors, and baseboard go in. The mini-split condenser is commissioned. Flooring - typically luxury vinyl plank or tile on the slab - is installed. The kitchenette gets its sink, faucet, and under-counter fridge. Bath fixtures, the shower glass, and the vanity are set. We walk the unit with you for a punch list, then stand with the county inspector for final sign-off. The job closes when you have a certificate of occupancy in hand and a fully functioning second dwelling.

Throughout the build, your single point of contact is a superintendent who knows the ARB submission requirements and the Collier County inspection workflow. If this garage conversion is part of a full Home Additions & ADU in Lely Resort scope - say you’re adding square footage beyond the garage footprint - we phase the work so the ADU can be locked off and lived in while the addition continues.

The Choices That Shape Your Garage Conversion ADU

Every garage is different, and the decisions you make about layout, systems, and finishes move the final number. Here are the big ones.

  • Attached vs. detached garage. An attached garage shares at least one wall and often the roofline with the main house, which simplifies tying into existing electrical and plumbing - costs track toward the lower end of the range. A detached garage needs its own subpanel feed trenched from the main service, a separate water lateral from the street or well, and sometimes a new sewer tap, which pushes the budget toward the upper end.
  • Plumbing scope. The single biggest cost swing in any garage conversion is whether you need a full bathroom with a shower, a kitchenette with a sink, or both. Running a 3-inch drain line through an existing slab in Lely Resort - where the wet-season water table sits just under the footing - often means cutting and removing concrete, digging deeper than inland jobs, and backfilling with select fill to prevent settlement. A powder bath costs far less than a full bath with a tiled shower.
  • HVAC system. Most Lely Resort garage conversions get a ductless mini-split heat pump sized for the square footage. If the main house has a newer high-SEER system with enough capacity, we can sometimes extend a ducted branch - but the ARB and your sub-association CC&Rs may limit where the outdoor condenser can sit, so placement gets reviewed during the ARB submission.
  • Flooring and moisture mitigation. Every garage slab in Lely Resort gets a moisture-vapor emission test. If the reading comes back high - common on older CBS villas in the Players Club and Greenlinks sections - we spec a two-part epoxy vapor barrier before the finished floor goes down. Skipping this step leads to buckled LVP and mold inside of two wet seasons. Tile on a decoupling membrane is the most forgiving option; floating LVP with a built-in pad is the most budget-conscious.
  • Window and door package. Any new opening cut into a CBS wall requires an impact-rated assembly with a product approval number on file with Collier County. Andersen and Pella both manufacture HVHZ-compliant units we use regularly. The size and quantity of windows you want - and whether you opt for a sliding glass door to a small patio - moves the line item meaningfully.

We use concrete-products suppliers like Quikrete and Sakrete for slab repair and grout work, and when the ADU scope calls for precast elements - such as a small stoop or landing - Oldcastle has products that speed the finish stage. If you’re also thinking about interior finish work once the drywall is up, homeowners often pair this phase with Backsplash, Tile & Flooring in Lely Resort so the same crew handles the wet areas from rough to finish.

What Garage Conversion ADU Costs in Lely Resort, FL

A garage conversion ADU in Lely Resort runs $45,000 to $130,000, with the typical single-car attached-garage conversion landing between $55,000 and $85,000 when built with a full bath, kitchenette, and mini-split HVAC. The range is wide because no two garages are in the same condition, and the permitting path through the ARB and county adds hard costs that don’t exist in unincorporated areas.

Here’s what pushes a job toward the low or high end of that range:

  • Square footage and layout complexity. A 250-square-foot single-car garage with a simple rectangular plan costs less than a 500-square-foot two-car garage that needs structural beams to clear-span the living area.
  • Slab condition and plumbing depth. A slab with minimal cracking and low moisture vapor emission needs less prep. Lely Resort’s high seasonal water table adds excavation depth and dewatering time on any bathroom drain that runs under the slab, which adds labor and material cost.
  • Electrical service capacity. If the existing main panel has open breaker slots and enough ampacity, adding a 60-amp subpanel to the ADU is straightforward. If the panel is maxed out, a service upgrade adds $3,500 to $6,000 to the project.
  • Interior finish level. Builder-grade cabinets, a fiberglass shower pan, and laminate counters keep the budget lower. Custom cabinetry, a tiled walk-in shower with a glass enclosure, quartz counters, and solid-core interior doors push it higher. Many Lely Resort homeowners choose a finish level consistent with the main house, especially in estate-home sections like Majorca.
  • ARB-required exterior modifications. If the garage door opening becomes a wall with a window and stucco patch, the ARB requires the finish and paint to match the existing elevation exactly - often meaning a full re-paint of that wall plane to avoid a visible seam. This is a small line item but it’s unique to master-planned communities with architectural review.

Every estimate we write is a fixed-price, line-item scope - not an allowance range you have to hope holds. It includes all permits, ARB submission documents, materials, labor, and the final county inspection. The 730-Day Done Right Promise covers the workmanship on everything we build. What it doesn’t include are change orders you initiate after permits are issued - those get priced and approved separately so the original number stays honest. Call (844) 638-7249 for a free on-site estimate, and you’ll have a written proposal in hand, not a verbal ballpark.

What Lely Resort Homes Specifically Do to This Job

Garage conversions in Lely Resort run on a different rulebook than conversions in unincorporated Collier County. Every exterior modification - even infilling a garage door opening with a stucco wall and a new window - must clear the community’s Architectural Review Board before the county will issue a building permit. The ARB enforces a tightly controlled palette of exterior colors, window profiles, and stucco textures tied to your specific sub-association. We’ve seen out-of-area crews submit a county-compliant window that isn’t on the ARB’s approved product list and get a stop-work notice within days. The dual-approval workflow adds two to four weeks to the front end of the project and means your contractor needs to be fluent in ARB submission packages - not just county permitting.

The housing stock itself shapes the work. Most garages we convert are concrete-block shells built between the mid-1990s and the 2010s. The older CBS structures in sections like the Classics and the Masters often have slab-edge settlement and hairline cracking from two decades of wet-dry cycling in the expansive coastal soil. We evaluate every slab before we design the bathroom layout, because a drain-line trench cut through an already-stressed slab edge can propagate cracking if the repair isn’t doweled and epoxied correctly. Newer coach homes in the still-building phases of the neighborhood have cleaner slabs but often share a fire-rated demising wall with an adjacent unit, which limits where we can cut new openings without triggering a structural engineering review.

The HVHZ requirements touch every part of the conversion. Windows, the entry door, and any sliding glass door must carry a Florida Product Approval number and be installed to the county’s wind-load details. The mini-split condenser needs hurricane tiedowns. These aren’t optional upgrades - they’re code minimums that every permitted ADU in Lely Resort must meet, and they’re part of why the base cost for a compliant conversion starts where it does. If the conversion scope grows into a larger addition, our Home Additions & ADU team handles the full structural and envelope work under the same permit set.

Serving Lely Resort, FL - Our Local Coverage Area

We’re based in the Lely Resort area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Garage Conversion ADU in Lely Resort

Get a Fixed-Price Estimate for Your Garage Conversion ADU in Lely Resort

We’ll walk the garage with you, measure, test the slab moisture, check the panel capacity, and talk through the floor plan that makes sense for your lot. Then you’ll get a written, line-item proposal - not a ballpark, not an allowance range. Derek Hollenbeck and the Groundwork Construction Co. team have built garage conversions across Lely Resort’s sub-associations and know the ARB submission process cold. Call (844) 638-7249 to schedule your free on-site estimate. A live person answers - no voicemail, no callback wait.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., building garage conversions and ADUs throughout Lely Resort since 2014.

Why Lely Resort Chooses Groundwork Construction Co. of Fort Myers

We set the standard for garage conversion adu in Lely Resort.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Lely Resort

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Lely Resort - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local garage conversion adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Lely Resort Customers Say

Trusted by homeowners across Lely Resort and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Garage Conversion ADU in Lely Resort?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Lely Resort.

(844) 638-7249

Request a Free Estimate in Lely Resort

Tell us about your garage conversion adu needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch