A Groundwork company - serving Fort Myers, FL
Full Kitchen Remodeling in Villas, FL | Groundwork Construction Co. of Fort Myers

Full Kitchen Remodeling in Villas - One Written Price, No Change Orders

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Full Kitchen Remodeling in Villas, FL: What It Really Takes

A full kitchen remodel in Villas strips the room to the studs and builds it back new - new layout, new plumbing and electrical where needed, new cabinetry, countertops, flooring, and finishes. Most jobs in this area run 6 to 10 weeks from demo to final walkthrough, and you should budget $14,000 to $45,000 for a complete gut renovation done by a licensed crew that pulls permits. Call (844) 638-7249 to schedule a free on-site estimate and get a written, line-item price for your specific kitchen.

How We Take a Villas Kitchen From Gutted to Finished

We follow the same sequence on every full kitchen remodel because skipping steps in a 1960s-1980s concrete block home creates expensive surprises. Here is what your 6-to-10-week timeline actually looks like.

Stage 1: Demolition and Discovery (Days 1-3)

Cabinets come out, flooring gets pulled, drywall or plaster comes down to expose framing, and we cap plumbing and electrical at the wall. This is also when we confirm what is behind the walls. In Villas, we regularly find corroded rebar inside CBS walls and deteriorated mortar joints from decades of salt-heavy humidity seeping through hairline stucco cracks. We take photos of everything before covering it back up, and if we find structural or moisture issues, you get a documented change-order with a fixed price before we move forward, not a surprise bill at the end.

Stage 2: Rough-In and Structural Work (Days 4-15)

If you are moving the sink, relocating the range, adding a kitchen island, or opening a load-bearing wall, this is when the framing, plumbing rough-in, and electrical rough-in happen. A Lee County building inspector must sign off on the rough-in before we can insulate and close the walls. For pre-2002 CBS homes in Villas, this inspection frequently triggers a review of the existing electrical panel and the roof-to-wall hurricane strap connections - even when the permit was only scoped for a kitchen. We factor that possibility into our upfront pricing so it is not a shock.

Stage 3: Drywall, Flooring, and Cabinetry (Days 16-35)

Walls get closed, taped, and finished. Flooring goes in - tile, engineered hardwood, luxury vinyl plank, whatever you chose at the design consultation. Then cabinets arrive. Stock and semi-custom lines from brands like KraftMaid are delivered pre-assembled; custom cabinet orders add 2 to 4 weeks to the timeline and move your final completion date accordingly. Cabinet installation and leveling typically takes 3 to 5 days, and we laser-measure every run so countertop templating is exact.

Stage 4: Countertops, Backsplash, and Trim (Days 36-50)

Once cabinets are set, the countertop fabricator templates, fabricates, and installs - usually a 7-to-10-day window from template to install for natural stone or quartz, shorter for laminate. Backsplash tile goes in next, followed by sink and faucet hookups, light-fixture installation, and finish trim. Appliances get connected and tested. If you opted for under-cabinet lighting, a pot-filler, or dedicated circuits for high-draw appliances, the electrician completes those tie-ins here and we schedule the final electrical inspection.

Stage 5: Punch-List and Final Walkthrough (Days 51-60+)

We walk the entire kitchen with you and note anything that needs adjustment - a cabinet door that is a sixteenth-inch out of alignment, a grout line that needs touching up, a drawer glide that feels stiff. We fix it, clean the workspace, and hand you the keys with the permit sign-off and a written summary of the work done. Every full kitchen remodel we complete in Villas is covered by our 730-Day Done Right Promise: if something is not right, we make it right, no runaround.

The Choices That Shape Your Kitchen Remodel

Every full kitchen remodel forces a handful of decisions that set the budget and define the finished room. Here are the ones that matter most, with honest trade-offs.

  • Cabinetry grade. Stock cabinets from a brand like KraftMaid keep you near the lower end of the Villas price range and ship in 2 to 3 weeks. Semi-custom gives you more door styles, finish options, and storage configurations - expect to add $4,000 to $8,000 over stock. Full custom cabinetry, built to your exact dimensions, pushes a mid-sized Villas kitchen toward the upper end of the $14,000-$45,000 range but solves awkward layouts that off-the-shelf boxes cannot.
  • Countertop material. Laminate is the budget play ($25-$40 per square foot installed) and holds up fine to daily use. Quartz and natural stone run $65-$130 per square foot installed and resist stain, heat, and scratching far better over a 15-to-20-year horizon. In Villas kitchens with large islands, the countertop square footage alone can swing the total job cost by $3,000 to $6,000.
  • Layout changes. Keeping the sink, range, and refrigerator in their existing locations avoids plumbing and electrical relocation costs. Moving the sink to the other side of the room or adding a gas line for a new range requires new rough-in work, wall penetrations in a CBS structure, and a plumbing or mechanical permit rider. That typical move adds $2,500 to $5,000 to a Villas kitchen remodel.
  • Flooring scope. If the new flooring stops at the kitchen doorway, the install is fast and cheap. If you want continuous flooring flowing into the dining area or living room, the square footage doubles and you may need to address slab flatness issues. Post-Ian slab settlement is a real factor in Villas - we check for dips and cracks with a laser level before the first tile is laid.
  • Lighting and electrical. A basic three-fixture kitchen (one ceiling, two pendants over an island) stays under $1,200 in electrical labor. A layered lighting plan with recessed cans, under-cabinet LED strips, in-cabinet puck lights, and dedicated 20-amp circuits for a microwave drawer and wine fridge can push electrical to $3,000 and up. Every pre-2002 Villas home we open up gets its panel ampacity checked before we add load.

What a Full Kitchen Remodel Costs in Villas, FL

A full kitchen remodel in Villas typically lands between $14,000 and $45,000. A smaller galley kitchen with stock cabinets, laminate counters, and no layout changes stays near $14,000-$20,000. A larger, open-plan kitchen with semi-custom cabinets, quartz countertops, a relocated sink wall, and continuous flooring into the living area runs $30,000-$45,000.

The five variables that push a Villas kitchen toward the high end are square footage, age of the existing CBS structure, whether you relocate plumbing or electrical, the material grade you choose, and the permit scope. A straightforward cabinet-and-counter swap on a post-2002 home with modern hurricane straps and an updated panel pulls a simpler permit and costs less to build. A full gut of a 1972 concrete-block ranch kitchen where we find corroded rebar, knob-and-tube-era wiring remnants, and floor slab settlement from Ian’s flood saturation will add structural remediation days and permit riders that move the number up.

Our written estimates are line-item quotes, not vague ranges. They spell out exactly what is included - demolition, rough-in, drywall, cabinetry, countertop fabrication and install, flooring, trim, appliance hookup, and permit fees - and they note anything that falls outside the scope, like custom window treatments or appliance purchase. You see the price before you sign, and it does not change unless you ask us to change it. Call (844) 638-7249 for a free estimate on your Villas kitchen.

What Villas Homes Specifically Do to This Job

Villas sits in the Lee County corridor that took a direct strike from Hurricane Ian’s Category 4 eyewall in September 2022, and the construction environment here is unlike any other Southwest Florida market. The community is dominated by slab-on-grade concrete block ranch homes built between roughly 1960 and 1985 - long before Florida’s post-Andrew high-velocity hurricane zone codes mandated hurricane straps, impact-rated openings, or code-compliant roof-to-wall connections.

On nearly every full Kitchen Remodeling in Villas of a pre-2002 CBS home, a straightforward building permit triggers a cascade of additional inspections: hurricane-strap retrofit review, electrical panel evaluation, and in many cases a FEMA elevation certificate check. The Lee County Building Department will not close the permit on a gut renovation until those boxes are checked. That means your kitchen remodel timeline and budget must account for structural and electrical upgrades that a newer home in a different market avoids entirely.

We also contend with decades of salt-air exposure in Villas, which accelerates rebar corrosion inside CBS walls and deteriorates mortar joints. Open up a 1970s kitchen wall near the Caloosahatchee River estuary side of the community and there is a real chance we will find steel that looks like it spent 50 years underwater. That is not a catastrophe - it is fixable - but it adds 2 to 3 days of remediation that a cookie-cutter remodeler’s quote will not include. We see it, we budget for it, and we handle it as part of a complete Kitchen Remodeling done to code.

Many Villas homeowners pair a full kitchen remodel with a Full Bathroom Remodeling in Villas while we have rough-in trades on site, or they update the guest bath with a Walk-In Showers & Shower Remodeling in Villas. Consolidating the plumbing and electrical rough-in across two rooms reduces the per-room cost. And if you are already pulling a full kitchen permit in unincorporated Lee County, adding a bathroom permit scope during the same project window streamlines the inspection schedule.

Every permit we pull in Villas is handled by our team, start to finish. We know the Lee County plan-review timeline, we know which inspectors want to see rough-in photos before the drywall goes up, and we know the post-Ian FEMA advisory base flood elevation map changes that affect slab-on-grade homes near the Caloosahatchee drainage basin. That local knowledge is built into our price, not bolted on later.

Serving Villas, FL - Our Local Coverage Area

We’re based in the Villas area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Full Kitchen Remodeling in Villas

Free Estimate for Your Villas Kitchen Remodel

A full kitchen remodel in Villas starts with a no-pressure, on-site walkthrough. We measure the room, talk through what you want the space to do, discuss realistic material options for your budget, and hand you a written, line-item price - not a guess, not a range that drifts. Call (844) 638-7249 to schedule yours. We answer live, 24/7, and we will have a background-checked, uniformed estimator at your door ready to talk real numbers.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Villas homeowners with full-scope kitchen remodels since 2014.

Why Villas Chooses Groundwork Construction Co. of Fort Myers

We set the standard for full kitchen remodeling in Villas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Villas

Getting your full kitchen remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full kitchen remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Villas - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Villas Customers Say

Trusted by homeowners across Villas and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Kitchen Remodeling in Villas?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Villas.

(844) 638-7249

Request a Free Estimate in Villas

Tell us about your full kitchen remodeling needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch