A Groundwork company - serving Fort Myers, FL
Garage Conversion ADU in Tice, FL | Groundwork Construction Co. of Fort Myers

Garage Conversion ADU in Tice - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What It Actually Takes to Convert a Garage Into an ADU in Tice

Converting an existing garage into a legal accessory dwelling unit in Tice typically costs $45,000 to $130,000 and takes 14 to 22 weeks from permit application to certificate of occupancy. The wide range reflects what we find once walls come open: a 1960s concrete block garage with no insulation and a slab that predates current flood-elevation rules is a very different starting point than a newer, partially finished structure. In Tice specifically, the biggest wildcard is what Lee County’s post-Ian code-compliance reviewers will require beyond the scope you originally planned. Call (844) 638-7249 for a free on-site estimate based on your actual garage, not a guess.

Call (844) 638-7249

How We Turn a Tice Garage Into a Legal, Livable ADU

The sequence matters here because Lee County inspections gate every phase. You cannot close a wall until rough-in plumbing, electrical, and mechanical have each been signed off separately, and missing an inspection window means days added to the schedule. Here is how a typical garage conversion moves from slab to finished unit.

Stage 1 - Plans, permits, and what the county wants (Weeks 1-4). We measure everything, document existing conditions, and prepare architectural and structural drawings. For a Home Additions & ADU in Tice project, the permit package also includes a site plan showing setbacks, flood-zone elevation, and tie-in to your existing home’s utilities. Lee County’s building department in Fort Myers processes garage conversion permits, and post-Ian plan-review queues are real. We submit the package and pre-schedule the rough inspection dates at the same time so your job never idles waiting on a county inspector. You are making decisions during this stage: floor plan layout, kitchenette or full kitchen, bathroom location, window and door sizes, and whether you want a mini-split or tie into your main HVAC.

Stage 2 - Demo, slab work, and what’s hiding in the walls (Days 1-8). The garage door and track come out, along with any drywall, pegboard, or old paneling. In Tice’s older CBS homes, we almost always find moisture intrusion along the bottom plate where the slab meets block walls - decades of wet-season standing water wicks up and rots framing that looked fine from the outside. If we find termite damage or mold, we stop and bring you photos before proceeding. The slab gets ground and prepped for plumbing trenches, and any required flood-vent or elevation adjustments get engineered at this point. We install hurricane straps and any structural upgrades the county reviewer flagged during plan check, which on a pre-Ian garage often means new roof-to-wall ties and impact-rated window bucks.

Stage 3 - Rough-in: plumbing, electrical, HVAC, and insulation (Days 8-20). Trenches get cut, drain lines run, supply lines stubbed up for the bathroom and kitchen. We pull new circuits from your main panel or install a subpanel if load calculations demand it. Ductless mini-splits are our default recommendation for Tice ADUs because they handle humidity year-round without punching big holes in an older block structure. Closed-cell spray foam goes into the ceiling and block walls - the R-value per inch is the highest you can get, and it acts as a secondary moisture barrier in Tice’s humid climate. Rough-in inspections happen here; nothing gets covered until the county signs off.

Stage 4 - Drywall, finishes, and the things you touch every day (Weeks 4-6). Once the walls are closed, the space starts looking like a home. Flooring, trim, doors, paint. Kitchenette or full-kitchen cabinets and countertops get installed. The bathroom gets tile, vanity, and fixtures. At this stage you are choosing finish materials: LVP versus tile for a slab that might see occasional dampness, quartz versus laminate countertops, and whether you want standard hollow-core interior doors or something that blocks sound more effectively between the main house and the ADU.

Stage 5 - Final inspections, punch list, and keys (Weeks 6-8 after finishes). The county does a final building, electrical, plumbing, and mechanical inspection. We walk the unit with you, note anything that needs adjusting, and resolve it before we consider the job done. You receive a certificate of occupancy from Lee County, which matters for insurance, rental licensing, and resale value. Every garage conversion we complete is covered by our 730-Day Done Right Promise: if something was not built right, we come back and make it right.

The Choices That Shape Your ADU

These are the real decisions our home additions & adu team walks through with Tice homeowners. Each one moves the budget and changes how the unit lives day-to-day.

  • Bathroom: half-bath versus full bath. A powder room with a toilet and sink keeps plumbing simple and cost lower. Adding a shower or tub means a larger drain line, more tile, waterproofing, and an exhaust fan that vents to the exterior - roughly $6,000 to $15,000 in added scope depending on fixture grade and whether we are tying into existing drain lines or cutting new ones through slab.
  • Kitchenette versus full kitchen. A kitchenette - compact refrigerator, microwave, sink, no cooktop or oven - qualifies as an efficiency unit under Lee County’s ADU rules and avoids the need for a full Type I hood and dedicated gas or 240V lines. A full kitchen with a range, hood, and dishwasher adds $8,000 to $20,000 depending on cabinetry, countertop material, and appliance selection. Homeowners often pair this with Cabinets & Countertops in Tice work we can bundle into the same project.
  • HVAC: mini-split versus tied to the main system. A ductless mini-split gives the ADU independent temperature and humidity control and avoids the static-pressure headaches of extending ductwork through an older home. Tying into an existing central system is possible but rarely the right call for Tice garages - the existing unit is rarely oversized enough to handle the additional conditioned square footage. Mini-splits run $3,500 to $7,000 installed depending on BTUs and whether you choose a single-zone or multi-zone unit.
  • Windows and doors: impact-rated or standard. Lee County requires impact-rated openings or shutters on new residential construction. We install impact-rated windows and sliding glass doors as standard on every garage conversion. Andersen and Pella both make hurricane-rated product lines that meet Florida Product Approval code, and the cost difference from standard units is roughly 30 to 50 percent - but skipping this is not an option on a permitted Tice ADU.
  • Flooring: tile versus LVP versus polished slab. A garage slab sits on grade. In Tice’s high-water-table conditions, even a slab with a vapor barrier can transmit moisture during heavy summer rain cycles. Luxury vinyl plank with an attached underlayment handles occasional dampness without warping. Porcelain tile is bulletproof but cold underfoot and costs more to install. Polished concrete is the most durable but requires sealing every few years. LVP lands around $4 to $8 per square foot installed; tile runs $8 to $15. Homeowners often extend the same flooring into the ADU that they picked for a recent Backsplash, Tile & Flooring in Tice renovation in the main house.

What a Garage Conversion ADU Costs in Tice, FL

As stated above, the range is $45,000 to $130,000. Most single-car garage conversions in Tice’s 1950s-to-1970s housing stock land between $65,000 and $95,000 when built to current Florida Building Code with a full bathroom and kitchenette. Two-car garages converted to one-bedroom ADUs with full kitchens push toward the upper end.

Here is what moves the number:

  • Garage size and layout. A 240-square-foot single-car garage costs less to convert than a 480-square-foot two-car, but the cost per square foot drops as the space gets larger because the expensive rooms (kitchen, bathroom) are fixed costs.
  • Existing slab condition. If the slab has settled, cracked, or lacks a vapor barrier, we may need to pour a new topping slab, add a moisture barrier, or cut and patch for plumbing - any of which can add $3,000 to $8,000 before framing starts.
  • Plumbing reach. A bathroom located on the wall nearest the main house’s sewer line costs far less than one on the far side of the garage that requires a long sewer trench run, a pump-up system, or cutting through thick 1960s slab for dozens of feet. In Tice, where septic tanks are common on larger lots away from the old grid, we also need to verify your existing system can handle the additional bedroom’s calculated daily flow before the county will issue permits.
  • Electrical service capacity. Many Tice homes still have 100-amp panels that were adequate when the house was built. Adding a full ADU with a kitchen, mini-split, and bathroom often pushes the load calculation past that rating, triggering a panel upgrade to 200 amps - roughly $3,000 to $5,000.
  • Finish level. Quartz countertops, soft-close cabinetry, floor-to-ceiling tile in the shower, and impact-rated French doors cost more than laminate counters, stock cabinets, a fiberglass shower pan, and a standard sliding door. We write fixed-price estimates with line-item finish allowances so you control where the dollars go.

Every estimate we give in Tice is a written, line-item price - the number you see is the number you pay. No change orders because we guessed wrong during the walkthrough. Call (844) 638-7249 to schedule a free on-site estimate and we will measure your garage, check your panel, and give you a real number.

What Tice Homes Specifically Do to This Job

Tice is an older, working-class unincorporated community along the Caloosahatchee’s eastern edge where the housing stock tells you exactly what era it was built: modest CBS homes from the 1950s through the 1970s, many with the original wood-truss roofs, single-pane jalousie windows, and slabs poured long before anyone worried about flood-zone elevation or modern tie-down requirements. When Hurricane Ian’s eyewall passed directly over Lee County in September 2022, these houses took a beating. What we regularly see now, walking into a Tice garage for a conversion estimate, is a structure where the roof sheathing was patched after the storm but the underlying truss-to-wall connections were never upgraded, and the block walls show moisture staining from months of post-storm humidity before repairs were completed.

That reality changes the job. A garage conversion permit in unincorporated Tice triggers a full Florida Building Code compliance review, which means the county reviewer will flag missing hurricane straps, non-impact-rated openings, and any roof decking that does not meet current nail-pattern requirements - even if you did not budget for those upgrades. We factor this into our estimates from the start because we work here regularly and know the pre-Ian building stock. Out-of-area contractors who do not pre-schedule Lee County inspections at the point of permit application routinely learn the hard way that post-Ian inspection queues stretch weeks, stalling jobs mid-phase while subcontracted crews move on to other work. We pre-book every inspection when we submit the plans so your conversion never sits idle waiting on the county.

Serving Tice, FL - Our Local Coverage Area

We’re based in the Tice area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Garage Conversion ADUs in Tice

Get a Free, No-Obligation Estimate on Your Tice Garage Conversion

If you have a garage in Tice you are thinking about converting into an ADU, let us walk it with you. We will measure the space, check your panel, assess the slab and roof structure, and give you a written estimate that accounts for Lee County’s real permitting and inspection timelines, not a generic number pulled from a formula. Our team is led by Derek Hollenbeck, and every technician who shows up is background-checked and in uniform. Calls are answered by a live person 24/7 - no voicemail black holes. Call (844) 638-7249 today to schedule your free estimate and design consult.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Tice and Lee County since 2014.

Why Tice Chooses Groundwork Construction Co. of Fort Myers

We set the standard for garage conversion adu in Tice.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tice

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Tice - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local garage conversion adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tice Customers Say

Trusted by homeowners across Tice and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Garage Conversion ADU in Tice?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Tice.

(844) 638-7249

Request a Free Estimate in Tice

Tell us about your garage conversion adu needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch