A Groundwork company - serving Fort Myers, FL
Full Bathroom Remodeling in Cypress Lake, FL | Groundwork Construction Co. of Fort Myers

Full Bathroom Remodeling in Cypress Lake - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What a Full Bathroom Remodel in Cypress Lake Really Takes

A full bathroom remodeling project in Cypress Lake means taking the room down to the studs and subfloor, reconfiguring the layout if you want, and rebuilding everything from plumbing rough-ins to the finish trim. Most jobs in the area run between $9,000 and $28,000, and a complete gut renovation on a typical guest or hall bath takes our crew about three to four weeks from demolition to final walkthrough. Call us at (844) 638-7249 if you’re ready to talk specifics, square footage, and a real number for your home.

The cost spread is wide because “full” means something different in a 1970s concrete block stucco home near Winkler Road than it does in a newer build off Cypress Lake Drive. You might be keeping the toilet and vanity where they are but gutting the tub surround down to bare studs. Or you might be knocking out a closet wall to steal space, moving the shower drain six feet, and adding a double vanity where there used to be a linen cabinet. Both are full remodels. The budget, the permit path, and the timeline change accordingly.

The Process: What Happens the Day We Start, and Every Day After

We do full bathroom remodeling in Cypress Lake the same way every time: a defined sequence with clear decision points, so you know what’s happening before it happens. Here’s how it goes.

Stage 1: Demolition and discovery (days 1-2). We protect the travel path with floor coverings and zip-wall dust barriers, then remove everything down to the framing. Sinks, vanities, toilets, tubs, tile, drywall, old insulation. This is the stage where we learn what the walls have been hiding. In Cypress Lake homes built in the 1970s and 1980s, that often means discovering water-damaged bottom plates behind old shower tile, corroded copper supply lines, or cast-iron drain stacks that should have been replaced a decade ago. We document it, send you photos, and price any necessary structural or plumbing corrections before we go further.

Stage 2: Rough-in inspections (days 3-5). With the room opened up, our plumbers and electricians relocate supply lines, drain lines, outlets, and switch boxes to match the new layout. This is the window where moving a shower drain or adding a dedicated GFCI circuit happens. Lee County requires a rough-in inspection before we can close any walls, and the local permit office has been running a backlog since Hurricane Ian. We pull permits the moment you sign the contract so we are not waiting on the county when the rough-in is ready.

Stage 3: Wall and floor closure (days 6-10). New moisture-resistant drywall or cement board goes up, seams are taped and mudded, and the shower pan or tub base gets set and leveled. If you chose a curbless walk-in shower configuration, this is when we frame and waterproof the sloped pan. The floor substrate goes down next, whether that’s cement board for tile or a self-leveling underlayment for luxury vinyl plank.

Stage 4: Tile and finishes (days 11-18). This is the longest visible phase. Tile installation runs wall-to-wall in the shower or tub surround, then floor tile, then any accent niches or decorative bands. Grout needs a full day to cure before sealing. Once tile is set, our carpenters hang the vanity, trim out the mirror, mount fixtures, and install the toilet. The glass enclosure for a walk-in shower gets measured at the start of this week and installed after tile and grout are fully cured, usually around day 18.

Stage 5: Trim and walkthrough (days 19-21). Final plumbing trim, electrical faceplates, caulk lines, paint touch-ups, hardware. We run every fixture, check every drain for leaks, and walk the room with you to flag anything that needs attention. Our 730-Day Done Right Promise means if something isn’t right, we’re back to make it right, no fine print and no back-and-forth.

The Materials and Layout Decisions You’ll Make

Before you pick a tile color, you pick the bones of the room. These are the choices that determine how the room functions and what the budget actually looks like.

  • Shower configuration: tub-shower combo, walk-in shower, or freestanding tub plus separate shower. A tub-shower combo keeps the existing drain location and costs less. A walk-in shower with a curbless entry and frameless glass enclosure adds waterproofing labor and glass cost but gives you the easiest access and a cleaner look. A freestanding tub plus a separate shower nearly always requires moving plumbing and expanding the footprint, which pushes a Cypress Lake full bathroom remodel toward the top of the price range.
  • Flooring: porcelain tile, ceramic tile, or luxury vinyl plank. Porcelain holds up best against Florida humidity and pool-water splash-in but costs more per square foot and takes longer to cut and lay. Ceramic tile is easier on the budget and still handles moisture well when sealed correctly. Luxury vinyl plank is warmer underfoot and installs faster, though we recommend tile in any bathroom that opens directly to a pool deck.
  • Vanity: stock, semi-custom, or full custom. A stock vanity cabinet from a brand like KraftMaid fits standard widths and ships fast, keeping costs in the low-to-mid range. Semi-custom gives you drawer configs and finish choices without a furniture-level price tag. Full custom cabinetry, built to the inch, makes sense when you want a double vanity in a space that was never designed for one.
  • Countertop surface: quartz, solid surface, or natural stone. Engineered quartz handles daily use without sealing and resists staining from hair dye, soap, and hard water. Solid surface offers integrated sink options and a seamless look. Natural stone like marble looks great in a guest bath but needs regular sealing in humid Cypress Lake air to prevent etching and water marks.
  • Shower wall surround: large-format porcelain, subway tile, or solid-surface panels. Large-format porcelain panels mean fewer grout lines to maintain. Subway tile gives a classic look at a lower material cost but with higher grout upkeep. Solid-surface wall panels are the fastest to install and the easiest to clean, a solid pick for a kid’s bathroom or a rental property.

What Full Bathroom Remodeling Costs in Cypress Lake, FL

A full bathroom remodeling project in Cypress Lake typically runs from $9,000 to $28,000. The low end gets you a straightforward gut-and-replace in a 5-by-8-foot hall bath where the toilet, sink, and tub stay in the same locations and you pick stock fixtures and ceramic tile. The high end covers a master bath expansion with a relocated shower drain, a double vanity, custom cabinetry, a curbless walk-in shower with frameless glass, and heated flooring.

What moves the number between those two ends:

  • Plumbing and electrical relocation. Moving a toilet flange or a shower drain across the room means cutting into the concrete slab. In the slab-on-grade homes that dominate Cypress Lake, that is the single largest labor cost variable in a full remodel.
  • Water damage repair. When we pull old tile and find rotted subfloor or termite-damaged studs behind a leaking tub surround, remediation adds days and dollars before new work can start. This is common in homes built before 1990.
  • Material grade. Stock vanity versus custom, ceramic versus porcelain, standard drywall versus full cement-board waterproofing, a shower curtain versus frameless glass. Each upgrade tier adds $800 to $3,000 in materials and labor.
  • Permit scope. A simple fixture-for-fixture swap triggers a straightforward Lee County permit. Moving drains or altering walls triggers plan review, which adds cost and timeline. Cypress Lake parcels in FEMA flood zones can also require elevation documentation depending on the scope, which we factor into the estimate before you sign anything.

Every written estimate from us includes line-item pricing for demolition, rough-in plumbing and electrical, drywall and waterproofing, tile labor and materials, fixture installation, trim, and cleanup. What it does not include until we open the walls: hidden water damage, termite repair, mold remediation, or code-correction upgrades to existing wiring or venting that predate current Florida Building Code. If we find it, we show you photos and give you a separate line-item number before we do the work. No change orders slipped in at the end. That is the upfront pricing promise we make on every job.

If you are also planning a larger renovation, a full bathroom remodel often pairs with work we do across the house. Some homeowners bundle a bathroom gut with a Roof Repair in Cypress Lake when a leak near the vent stack has caused the ceiling damage they are already fixing inside. Others go bigger and schedule a Roof Replacement & Installation in Cypress Lake before the interior work starts, so there is zero chance of new drywall getting wet. Both make sense in Cypress Lake, where Ian’s wind and water damage still shows up behind walls three years later.

What Cypress Lake Homes Specifically Do to This Job

Cypress Lake’s housing stock changes the math on a full bathroom remodel in ways that do not apply ten miles inland. The majority of homes here are single-story concrete block stucco builds from the 1970s and 1980s, sitting on slab-on-grade foundations with the bathroom plumbing cast directly into the concrete floor. Moving a drain line in a slab means saw-cutting, trenching, and patching, which is loud, dusty, and adds two to four days to the schedule. It is doable, and we do it regularly, but you need to know that cost going in.

The post-Ian rebuild cycle has also changed how Lee County processes permits. The local permit office has been backlogged, and Cypress Lake homeowners are now far more diligent about contractor vetting than they were before the storm. We are accustomed to showing our Lee County CGC license and providing a completed wind mitigation report so you know exactly who is in your home and what standards the work meets. A Bathroom Remodeling in Cypress Lake project that touches exterior walls may also trigger FEMA elevation certificate requirements if your parcel falls within an AE flood zone, which many in this area do. We pull that documentation early so it does not stall your rough-in inspection.

We also deal constantly with moisture trapped behind original tile surrounds in these older slab homes. The 40-year-old mastic adhesive used in the 1980s breaks down in Florida humidity, and by the time a homeowner notices crumbling grout, the greenboard behind it is often soft and moldy. That is the most common condition we find on day one in Cypress Lake, and it is the biggest reason our estimates always include a discovery contingency for water damage repair.

Serving Cypress Lake, FL - Our Local Coverage Area

We’re based in the Cypress Lake area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Full Bathroom Remodeling in Cypress Lake

Get a Fixed-Price Estimate for Your Full Bathroom Remodel

If you are planning a full bathroom remodeling project in Cypress Lake, the next step is a free on-site estimate. We measure the room, talk through the layout options and material choices, and give you a written, line-item price before we leave. No vague ranges, no “we’ll get back to you in a week.” You will know exactly what the job costs and why. Call (844) 638-7249 to schedule yours. A live person answers, day or night.

Our bathroom remodeling crew shows up background-checked and in uniform, with every permit pulled and every line item explained. From foundation to finish line, it is all backed by the 730-Day Done Right Promise.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Cypress Lake homeowners with fixed-price remodeling and a promise that is actually in writing.

Why Cypress Lake Chooses Groundwork Construction Co. of Fort Myers

We set the standard for full bathroom remodeling in Cypress Lake.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Cypress Lake

Getting your full bathroom remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Cypress Lake - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Cypress Lake Customers Say

Trusted by homeowners across Cypress Lake and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Bathroom Remodeling in Cypress Lake?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Cypress Lake.

(844) 638-7249

Request a Free Estimate in Cypress Lake

Tell us about your full bathroom remodeling needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch