A Groundwork company - serving Fort Myers, FL
ADU Site Prep & Utilities in Tice, FL | Groundwork Construction Co. of Fort Myers

ADU Site Prep & Utilities in Tice - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What ADU Site Prep & Utilities in Tice Actually Costs and How Long It Takes

ADU site prep and utilities in Tice typically runs between $45,000 and $130,000, with most projects taking 4 to 8 weeks to complete the ground-work phase before framing begins. That number covers clearing/grading, foundation work, trenching, and running new water, sewer, and electrical service from the street or main panel to the ADU footprint. Call (844) 638-7249 for an exact quote on your property - every Tice lot has its own variables, and we’ll give you a written line-item estimate at no cost.

Call (844) 638-7249

How We Handle ADU Site Prep & Utilities in Tice - The Real Sequence

Stage 1: Site Survey & Utility Locate (Days 1-3)

Before dirt moves, we flag every existing line. Florida 811 marks public utilities free of charge, but on older Tice lots we also hand-sweep with a private locator because 1950s-1970s homes often have undocumented irrigation lines, abandoned septic laterals, or homeowner-run electrical buried without conduit. You’ll decide early whether we’re tying into the existing septic system (if your Tice property isn’t on county sewer) or running new laterals - that single decision can swing the budget by $8,000-$15,000.

Stage 2: Clearing, Demolition & Rough Grading (Days 3-7)

We strip the ADU footprint of vegetation, remove any old concrete pads or sheds, and rough-grade for positive drainage. Tice sits in a high-water-table zone where standing water after rain is common, so we over-excavate by 6-10 inches and backfill with compacted shell or crushed stone before forming the slab - skip that step and you’ll get slab cracks within two wet seasons. If the site requires tree removal or major root clearing, this stage extends by 2-3 days and adds permitting steps through Lee County.

Stage 3: Foundation & Slab Prep (Days 7-14)

Form boards go up, vapor barrier goes down, rebar or wire mesh is tied per the engineered drawings. Lee County inspectors must sign off on the formwork and reinforcing before any concrete is poured - and post-Ian inspection queues in Tice are still running 5-10 business days out, so we pre-schedule this inspection at permit application to avoid dead time. Once the slab is poured and cured (3-5 days minimum before framing loads), we move to underground rough-ins.

Stage 4: Trenching & Underground Utilities (Days 14-28)

This is where the heavy digging happens. We trench from the main house panel to the ADU for a new subpanel feeder, from the water meter or main line for domestic supply, and from the nearest sewer lateral or septic tank for waste. Tice’s sandy loam soils trench fast but collapse easily - every trench deeper than four feet gets shored or stepped back per OSHA, which adds labor hours but is non-negotiable for safety. If we’re hitting coral rock or buried construction debris (common on older Tice parcels), the trenching timeline stretches and your budget moves toward the higher end of the range.

Stage 5: Backfill, Rough Inspections & Site Finish (Days 28-35)

Once underground plumbing and conduit are in, Lee County inspects the trench and rough-ins. After passing, we backfill in lifts, compact mechanically, and do final grading around the slab to direct water away. The last step before framing is stubbing out water, sewer, and electrical connections above the slab for the framing and MEP crews. At this point the site prep is complete and your ADU project - part of a full Home Additions & ADU in Tice - moves into vertical construction.

The Options You’ll Choose Between During ADU Site Prep

  • Monolithic slab vs. stem-wall foundation. A monolithic pour is faster and cheaper ($6-$10 per square foot) and works well on Tice’s flat lots with good drainage. A stem wall raises the finished floor 18-24 inches above grade - better flood protection in a high-water-table area, but adds $8-$15 per square foot and requires more concrete and masonry labor.
  • Septic tie-in vs. dedicated system. If your Tice home is on septic and the existing tank has capacity, we can tie the ADU into it and save you $5,000-$10,000. If the tank is undersized or failing (common in 1960s-era systems with steel tanks), you’ll need a new dedicated system or a replacement, which pushes the utility cost toward the upper end of the range.
  • Direct-bury vs. conduit-protected electrical feeder. Code allows direct-bury aluminum feeder cable, but we recommend running it inside schedule 40 PVC conduit - it adds about $3-$5 per linear foot but protects against the inevitable shovel strike or ground shift during Tice’s wet-dry cycles. Conduit also makes future upgrades possible without re-trenching.
  • Standard vs. hurricane-impact site-prep measures. Tice’s post-Ian reality means any ADU foundation must meet current Florida Building Code wind-load anchoring standards - but you can opt for upgraded Simpson Strong-Tie anchors and thicker slab-edge steel that exceed code minimums. It’s a few hundred dollars extra and worth it if you’re building a structure your family sleeps in.
  • Gravel drive vs. paved access for construction. During site work we need a stable access path for concrete trucks and material deliveries. A temporary compacted shell access runs $1,200-$2,500 depending on distance from the street. If you’re already planning a permanent driveway as part of a wider project, our home additions & ADU crew can coordinate that pour alongside the slab to save mobilization costs.

What ADU Site Prep & Utilities Costs in Tice, FL

Count on $45,000-$130,000 for the full site-prep and utility scope on a detached ADU in Tice. The low end covers a straightforward backyard site with close utility access, sandy soil with no obstructions, and a simple monolithic slab. The high end reflects properties requiring long trench runs from the street, septic system replacement, extensive tree/root removal, or soil stabilization in persistently wet areas.

Four things push the number: distance from existing utilities - every linear foot of trench adds labor, shoring, and conduit cost; soil conditions - hitting coral rock or old buried debris turns a two-day trench into a week’s work; septic vs. sewer - tying to county sewer where available is cheaper than a new septic field, but many Tice streets still lack sewer infrastructure; permit and impact-fee scope - Lee County assesses utility connection fees and ADU impact fees that can range from $3,000 to $12,000 depending on meter size and district, and those are separate line items in your estimate.

Our written estimate includes: site survey and utility locate, clearing and rough grading, foundation excavation and slab, all trenching and underground rough-ins, backfill and compaction, final grade, and the permit coordination. It does not include Lee County impact fees or separate electrical service upgrades to the main house, which we price transparently if needed. You’ll see every line broken out - no vague allowances, no change-order games. Upfront pricing with no surprises is how we’ve earned trust across Tice and the surrounding Lee County communities.

What Tice Homes Specifically Do to This Job

Site prep in Tice is different because the housing stock is different. Nearly every property we work on here was built between the 1950s and 1970s - modest concrete-block homes on lots that predate modern Florida Building Code. When you pull a permit for an ADU in unincorporated Lee County, the county reviews the entire scope against current code, and they’ll frequently flag the main house’s electrical service, existing septic load, or foundation setbacks. That means what starts as “just trench and pour a slab” often becomes a coordinated multi-trade job that includes a panel upgrade or a septic assessment before the ADU foundation passes inspection.

The post-Ian reality adds another layer: county building inspectors in Fort Myers are still working through backlogs, and inspection windows for underground and slab work can stretch 5-10 business days unless the slot is reserved the moment the permit number is issued. We pre-schedule every inspection at permit application - it’s a small procedural move that keeps your job from stalling mid-phase, and it’s the kind of thing contractors who don’t work Tice regularly get wrong. Homeowners often pair this ground-up work with interior upgrades to the main house, and our crews also handle Small & Partial Kitchen Remodels in Tice and Full Bathroom Remodeling in Tice - it’s common to sequence the ADU site prep first, then tackle the main house’s kitchen or bath while the ADU goes vertical.

Serving Tice, FL - Our Local Coverage Area

We’re based in the Tice area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - ADU Site Prep & Utilities in Tice

Get a Free ADU Site Prep Estimate in Tice

We’ll walk your Tice property, map the utility path, flag every permit trigger, and hand you a written estimate broken down line by line - no round numbers and no hidden change orders. Background-checked, uniformed crews handle every job, and a live person answers the phone 24/7 - no voicemail black holes. Call (844) 638-7249 to schedule your free on-site estimate and design consult. We’ll cover what’s possible on your specific lot and what the real timeline looks like given current Lee County inspection schedules.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Tice and Lee County with upfront pricing and the 730-Day Done Right Promise.

Why Tice Chooses Groundwork Construction Co. of Fort Myers

We set the standard for adu site prep & utilities in Tice.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tice

Getting your adu site prep & utilities handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu site prep & utilities needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Tice - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tice Customers Say

Trusted by homeowners across Tice and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for ADU Site Prep & Utilities in Tice?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Tice.

(844) 638-7249

Request a Free Estimate in Tice

Tell us about your adu site prep & utilities needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch