A Groundwork company - serving Fort Myers, FL
Full Bathroom Remodeling in Naples Manor, FL | Groundwork Construction Co. of Fort Myers

Full Bathroom Remodeling in Naples Manor - One Written Price, No Change Orders

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What a Full Bathroom Remodel in Naples Manor Really Involves

A full bathroom remodeling in Naples Manor means taking the space down to the studs and subfloor, then rebuilding everything - layout, plumbing, electrical, waterproofing, tile, fixtures, and finishes - as a brand-new room. Most full-gut jobs in this area run from $9,000 to $28,000 depending on size, material choices, and what we find inside the walls of these older concrete-block homes. A realistic timeline is 14 to 21 working days from demolition to final walkthrough, and the fastest way to get an exact number for your floorplan is to call (844) 638-7249 for a free, no-pressure estimate.

How We Take a Naples Manor Bathroom From Old to New

The process for a full bathroom remodel follows five clear stages. We lay this out upfront so you know exactly what’s happening and when.

Stage 1: Demolition & Discovery (Days 1-2)

We protect the travel path with floor runners and plastic containment, then strip everything - tile, drywall, tub or shower pan, vanity, toilet, flooring, and often the ceiling if it has water damage or old texture. Demolition typically takes one day. On day two we open the walls and inspect the plumbing stack, supply lines, electrical wiring, and slab condition. In Naples Manor homes built in the 1950s through 1970s, this is where we most often find corroded cast-iron drain lines, ungrounded wiring that needs a new circuit, or slab moisture that demands a vapor barrier before any new flooring goes down. You won’t make any final material decisions at this stage, but anything we uncover that falls outside the original scope gets documented and priced clearly before we proceed.

Stage 2: Rough-In & Structural Corrections (Days 3-6)

The rough-in is where all the behind-the-wall work happens. If you’re moving the toilet, shifting a wall, or relocating the shower drain, this is the stage where the plumbing reroutes and framing changes get done. We run new PEX supply lines, tie into the existing vent stack or add an air-admittance valve if wall access is tight, and pull dedicated 20-amp circuits for the GFCI-protected outlets required by Florida Building Code. Any unreinforced masonry we expose gets strapped or anchored to current wind-load standards. For Naples Manor properties in AE flood zones, we also assess whether the floor elevation or slab work triggers a “substantial improvement” review - something we flag immediately with the Collier County Building Department so there are no permit surprises later. The rough-in wraps with an electrical and plumbing rough inspection, typically scheduled within two business days.

Stage 3: Permits, Waterproofing & Prep (Days 6-9)

Collier County requires a building permit for any full bathroom remodeling job that moves plumbing, alters framing, or changes the electrical layout - which is nearly all of them. We pull the permit, schedule inspections, and manage the whole sequence on your behalf. While we wait for the rough-in sign-off, we install cement board or a Schluter waterproofing system on all wet-area walls and the shower floor, tape and seal every seam, and pour a self-leveling underlayment on the slab if the floor needs flattening before tile. This is also the week you’ll confirm your tile pattern, grout color, and trim finish. We ask homeowners to make those final selections by day 7 so materials are on site and nothing stalls the finish crew.

Stage 4: Tile, Fixtures & Millwork (Days 10-16)

Tile installation is the longest single stretch of the project. Wall tile goes in first, then floor tile, then grouting and a 24-hour cure before anyone walks on the surface. Once the tile sets, the plumber returns to set the toilet, install the shower trim and valve, and mount the vanity with the faucet and drain assembly. The electrician installs the exhaust fan, can lights or sconces, and switch plates. If you selected a frameless glass shower enclosure, the measure happens on day 14 and fabrication takes about a week off-site - we install it as soon as the glass arrives so you’re not left with an open shower.

Stage 5: Trim-Out & Final Walkthrough (Days 17-21)

The last few days cover all the finishing details: baseboards, door casing, caulking at every seam, mirror mounting, towel bar and accessory hardware, and paint touch-up. Our project lead does a 40-point internal quality check before you walk the space with us. Any item you flag gets fixed before we consider the job complete. The final Collier County inspection - if one is required for your permit scope - is the last box we check, and we handle every call and appointment to get it closed out.

The Options You’ll Choose Between

A full bathroom remodel involves decisions on every surface. Here are the real-world choices Naples Manor homeowners weigh, with the honest trade-offs on each.

  • Shower system: A standard pressure-balanced valve with a single showerhead keeps costs low and works reliably. A thermostatic valve with a rain head, body sprays, and a handheld on a slide bar adds roughly $800 to $1,800 depending on the fixture grade (Moen versus Kohler versus Brizo) and the number of diverter ports. The thermostatic system gives you precise temperature control and multiple spray patterns, but it requires a larger valve body behind the wall and may not fit a thin 2×4 stud cavity without furring out the wall.
  • Tile material: Ceramic wall tile is the most affordable option and holds up well in a ventilated bathroom. Porcelain floor tile costs more but resists water absorption better - important in Naples Manor where ambient humidity stays high nine months of the year. Natural stone like marble or travertine looks beautiful but needs annual sealing, and it’s more prone to etching from the slightly acidic well water some Collier County homes pull. Expect porcelain to run 20 to 40 percent more per square foot than ceramic, with stone adding another 30 to 50 percent on top of that for material and labor combined.
  • Vanity & countertop: A stock vanity cabinet with a cultured marble top lands in the lower third of the budget range. A semi-custom KraftMaid vanity with a quartz or solid-surface top produces a tighter fit in an odd-shaped floorplan and a more finished look, at roughly $800 to $2,000 more than stock. The biggest cost driver here is width - a 60-inch double-sink vanity costs about twice what a 30-inch single-sink vanity costs, even in the same material grade.
  • Flooring outside the shower: Porcelain tile is the most common choice and handles Naples Manor’s sandy foot traffic without scratching. Luxury vinyl plank is a lower-cost alternative that feels warmer underfoot and installs faster, but it doesn’t boost resale value the way tile does. The difference on a 40-square-foot bathroom floor is roughly $300 to $600, installed.
  • Exhaust fan & ventilation: Florida code requires an exhaust fan vented to the outside, not just recirculating through a charcoal filter. A basic 50-CFM builder-grade fan meets the code minimum. Stepping up to an 80 to 110-CFM Panasonic Whisper unit that runs near-silent and includes a humidity sensor costs $150 to $300 more and matters in a house without central AC in the bathroom zone - mold on the ceiling is a recurring problem in older Naples Manor homes with undersized fans.

What Full Bathroom Remodeling Costs in Naples Manor, FL

A full bathroom remodeling in Naples Manor runs from $9,000 to $28,000 with most projects landing between $13,000 and $19,000. The spread is wide because no two bathrooms start from the same condition or aim for the same finish level.

The five variables that push a job toward the low or high end, in order of impact: First, relocating plumbing - moving the toilet or shower drain to a different spot on the slab requires cutting concrete, re-routing waste lines, and a plumbing rough-in re-inspection, and that alone can add $1,200 to $3,000. Second, the existing condition behind the walls - older Naples Manor homes often have rusted-out galvanized supply pipes or cast-iron drain sections that must be replaced when we open the wall, a line item that can run $600 to $2,000 depending on how far the rot extends. Third, material grade - builder-grade tile and a stock vanity keep costs in the lower range; floor-to-ceiling porcelain with a custom vanity, quartz top, and high-end plumbing fixtures push the job past $20,000 without changing the square footage. Fourth, bathroom size - a compact 5’x7′ hall bath remodels for far less than a 10’x12′ master bath with a double vanity and a separate water closet. Fifth, permit scope - a simple fixture swap with no wall changes may not require Collier County review, but any job that moves walls, reroutes plumbing, or alters the electrical panel triggers a permit with inspection fees typically between $250 and $600.

Every estimate we write for full bathroom remodeling in Naples Manor is a fixed-price, line-item document. It includes demolition, debris disposal, all labor and rough materials, fixture and finish installation, and permit management. It does not include water damage remediation we can’t see before opening the walls - though we price that transparently the moment we find it. Call (844) 638-7249 to schedule an estimate, and you’ll get a written number, not a ballpark guess.

What Naples Manor Homes Specifically Do to This Job

Full bathroom remodeling in Naples Manor runs into a specific set of conditions that don’t show up the same way even a few miles north in Fort Myers or east in Golden Gate Estates. The core issue is the housing stock: most of these homes are concrete-block, slab-on-grade builds from the 1950s through 1970s, constructed decades before the Florida Building Code’s current wind-load and flood-resistance mandates took effect. When we open a bathroom wall in Naples Manor, we routinely find ungrounded wiring that has to come out, corroded copper or galvanized supply pipes embedded in the slab, and wall cavities with no vapor barrier between the block and the drywall. None of that is unusual for the neighborhood - it’s just what forty-plus years of Southwest Florida humidity does to a house that was built before modern moisture-management standards.

The other reality is permitting. Because Naples Manor is unincorporated Collier County, every full-gut bathroom renovation that moves plumbing or electrical runs through the county building department, not the City of Naples. The county’s inspection queue and fee schedule differ from the city’s, and a job that triggers a “substantial improvement” determination - common on post-Hurricane Ian repair work on lots with AE flood-zone designations - legally requires bringing the entire structure up to current base flood elevation. That’s a cost nobody wants to learn about after demo starts. We pull the permit on day one so the county’s requirements are known before we cut a single pipe, and if the job sits in a flood zone, we walk you through exactly what the elevation certificate says and what it means for scope and cost. Many Naples Manor homeowners also pair a bathroom remodel with exterior work that’s needed after the last few storm seasons - Roof Repair in Naples Manor or a full Roof Replacement & Installation in Naples Manor often hit the top of the priority list before the interior finish work begins, because nobody wants new tile under a leaking roof. When the whole scope calls for more than one trade, our Bathroom Remodeling crew coordinates directly with the roofing team so your home isn’t under construction any longer than it needs to be, and the project lead for your Bathroom Remodeling in Naples Manor is the single point of contact for all of it. That full-scope approach matters in a community like Naples Manor where so many homes need comprehensive work, not patch jobs.

Serving Naples Manor, FL - Our Local Coverage Area

We’re based in the Naples Manor area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked - Full Bathroom Remodeling in Naples Manor

Your Next Step on a Full Bathroom Remodel in Naples Manor

The best way to get a real price and timeline is a 30-minute walkthrough at your home. We’ll measure the space, talk through layout options, show you material samples, and hand you a fixed-price, line-item estimate - usually within 48 hours. No pressure, no vague numbers. Call (844) 638-7249 to book your free estimate for full bathroom remodeling in Naples Manor, and you’ll speak with a live person who can get you on the schedule this week.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Naples Manor with full-scope home construction and remodeling backed by the 730-Day Done Right Promise.

Why Naples Manor Chooses Groundwork Construction Co. of Fort Myers

We set the standard for full bathroom remodeling in Naples Manor.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Naples Manor

Getting your full bathroom remodeling handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your full bathroom remodeling needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Naples Manor - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local full bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Naples Manor Customers Say

Trusted by homeowners across Naples Manor and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Full Bathroom Remodeling in Naples Manor?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Naples Manor.

(844) 638-7249

Request a Free Estimate in Naples Manor

Tell us about your full bathroom remodeling needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch