A Groundwork company - serving Fort Myers, FL
Junior ADU & Interior Conversion in Tice, FL | Groundwork Construction Co. of Fort Myers

Junior ADU & Interior Conversion in Tice - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

70+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

What a Junior ADU and Interior Conversion Actually Looks Like in Tice, and What You’ll Pay

A junior ADU and interior conversion in our Tice service area is a permitted living space built entirely within your home’s existing footprint, most often by converting an attached garage, oversized utility room, or a section of the house with its own exterior entry. You’re not adding square footage. You’re reworking what’s already under roof into a code-compliant unit with a kitchenette, a bathroom, a separate entrance, and independent climate control. In Tice, these projects typically land between $45,000 and $130,000 and run four to seven months from design to final inspection. The spread is wide because no two existing floorplans present the same set of constraints. Call (844) 638-7249 to have us walk your specific home, and we’ll give you a line-item price before you commit to anything.

Call (844) 638-7249

How We Move a Junior ADU From an Idea to a Signed-Off Unit

The process has five distinct stages, and every one of them is driven by decisions you make. We don’t push a standard spec on anyone. Here’s how it unfolds on a Tice home.

Stage 1: Site walk and as-built verification. This happens week one, often within a few days of your call. We measure the entire space and open a small section of wall and ceiling at one corner to confirm framing type, slab condition, and whether any Ian-era moisture got trapped behind drywall where nobody cut it out after the storm. In Tice’s older CBS homes, that exploratory cut tells us more about the real scope of the job than any set of blueprints from forty years ago. You decide here whether to move forward. No charge for the estimate and design consultation.

Stage 2: Code-path selection and design lock. This takes two to four weeks. Because Tice is unincorporated Lee County, every permit flows through the county building department in Fort Myers, and the pre-2022 homes we most often work on almost always trigger a structural review under the current Florida Building Code. We sit down with you and map exactly what compliance upgrades the scope requires: hurricane straps, impact-rated openings, hardened roof decking if we’re touching the roof assembly for a Roof Repair service in Tice. You’ll choose your kitchenette layout, bathroom fixtures, flooring, and finishes here. We produce the stamped drawings your permit package needs.

Stage 3: Permitting and inspection scheduling. We submit to Lee County the day the drawings are signed off. This stage runs three to six weeks in Tice right now. The post-Ian inspection backlog is real, and we schedule every rough-and-final inspection slot at the moment of permit application, not after drywall is hung. That’s a Tice-specific habit that saves you weeks of idle time. You’re not making design choices here; you’re waiting on county turnaround while we order long-lead materials.

Stage 4: Construction. Most interior conversions take eight to fourteen weeks of active build time. We start with demo and moisture remediation, then rough in the new plumbing, electrical, and HVAC mini-split, frame any partition walls, hang and tape drywall, set the bathroom fixtures, install the kitchenette cabinets and countertops, lay flooring, trim out, and paint. The separate entrance goes in early, so the unit is physically sealed from the main house by the time finish work starts. You’ll walk the space with us at rough-in and again before trim, and we don’t move past either gate without your sign-off.

Stage 5: Final inspections and closeout. Lee County sends an inspector for the building final, the electrical final, and the plumbing final, usually across two visits. Once the green tags are posted, we do a walkthrough with you, hand over any appliance manuals and finish-care guides, and register your 730-Day Done Right Promise. From first cut to closeout, you’ve added a self-contained living unit without adding a single square foot of new foundation. That’s the core logic of an interior conversion, and in Tice it’s often the most cost-effective way to create rental income or house a family member on the same lot.

For homeowners tackling a wider set of upgrades at once, our Home Additions & ADU in Tice team can sequence the interior conversion alongside other structural work so you’re not permitting the same house twice.

The Options You’ll Choose Between When We Build Your Interior ADU

Every finish decision on a junior ADU comes down to a trade-off between upfront cost and long-term durability in Tice’s humidity-and-hurricane climate. These are the real choices our clients weigh.

  • Kitchenette layout: wet-bar depth or full galley. A compact wet bar with a sink, undercounter refrigerator, and microwave bay keeps plumbing runs short and cost low. A full galley with a two-burner cooktop and a 24-inch dishwasher adds roughly 40 percent to the kitchenette budget but makes the unit rentable long-term. Most Tice homeowners who plan to lease the space go galley from day one.
  • Flooring: luxury vinyl plank versus tile. LVP installs faster and costs less, but Florida slab moisture will telegraph through any cheap underlayment within two years. A properly sealed porcelain tile floor over a vapor barrier costs more upfront and lasts the life of the house. We spec Schluter Ditra or an equal decoupling membrane on every Tice slab pour; we won’t warranty LVP installed directly on grade without it.
  • HVAC: mini-split versus tapping the main trunk. A dedicated mini-split heat pump gives the ADU independent temperature control and doesn’t pull conditioned air from the main house. Tapping the existing central system costs less to install but means the unit’s comfort depends on the main-home thermostat. For a rental, go mini-split. For a guest suite, the shared system works.
  • Bathroom fixture grade. A standard Kohler or Delta builder-grade package keeps the bathroom under $5,000 in fixtures. Upgrading to a comfort-height toilet, a walk-in shower with a frameless glass panel, and a solid-surface vanity top pushes the bathroom closer to $9,000. Both paths are built to the same code; the difference is how the space feels to live in.
  • Impact-rated entry door and window choices. Code won’t let us install anything else in a Tice opening. You’re choosing between a flush steel door with a single sidelight or a fiberglass door with integrated blinds between the glass. The price gap is about $1,200, and the fiberglass door holds up better against salt-laden air drifting inland from the coast.

What a Junior ADU and Interior Conversion Costs in Tice, FL

A junior ADU and interior conversion in Tice runs $45,000 to $130,000. That range is broad for a reason. The low end, around $45,000, is a straightforward garage conversion where the slab is sound, the electrical panel has spare capacity, and the plumbing stack is on the adjacent wall. No structural upgrades beyond strapping the existing trusses. Drywall, tape, paint, a compact kitchenette, a simple bathroom, LVP flooring, and a mini-split. At $85,000 you’re usually relocating drain lines to reach the new bathroom location, upgrading the electrical service to 200 amps, and installing impact-rated windows where none existed before. At $130,000 you’re doing all of that inside a home that also needs Tice Roof Replacement & Installation and full truss-to-wall strapping because Ian’s winds torqued the original framing.

The five variables that move your number the most are: the condition of the existing slab and whether it needs grinding or leveling, the distance from the nearest drain stack, whether the main electrical panel needs a service upgrade, the chosen finish grade for flooring and cabinets, and the number of new impact-rated openings required by the compliance review. We put every line item in writing before you sign. No change orders unless you add scope mid-build. Our home additions and ADU team carries the same upfront pricing discipline across every project type we build.

What Tice Homes Specifically Do to This Job

Tice’s housing stock, predominantly 1950s-to-1970s concrete-block homes on slab, directly shapes the scope of any interior ADU conversion here. These homes were built under codes that no longer govern anything. The moment we pull a permit with Lee County for an interior conversion that touches framing, electrical, or plumbing, the review triggers a full Florida Building Code compliance check. That means a job that starts as “convert the garage” routinely expands to include hurricane straps on the existing trusses, impact-rated replacements and Tice Sliding & Patio Doors for every jalousie window in the converted space, and hardened roof decking if the permit package includes any roof-assembly modification. Contractors who haven’t worked Tice since Ian don’t always price that layered compliance, and the homeowner finds out when the county reviewer sends the plans back marked up.

Moisture is the other variable. Tice sits in a high-water-table zone where post-rain standing water is common, and the sustained humidity accelerates rot inside older wall assemblies. We’ve opened walls on Sunset Road and Tice Street homes and found mold colonized behind drywall nobody touched after the storm, because the water sat inside the block cavities for weeks before power returned. Every interior conversion here starts with a moisture assessment that tells us whether we’re hanging new drywall or remediating first. It’s not a complication. It’s just the reality of building inside Tice’s housing era, and we budget for it from day one. Some homeowners choose to pair this work with a Kitchen Design & Layout in Tice refresh in the main house while we’re already on site.

Serving Tice, FL - Our Local Coverage Area

We’re based in the Tice area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

Frequently Asked Questions About Junior ADU and Interior Conversions in Tice

Schedule a Free Estimate for Your Tice Junior ADU

If you’re thinking about converting an attached garage or an underused interior space into a permitted living unit in Tice, the next step is a phone call. We’ll walk the space, measure everything, open a small section of wall to check what we’re really working with, and hand you a written, line-item price. No obligation. No high-pressure pitch. Just real numbers from a crew that’s done this exact job on the same generation of CBS homes you’re living in. Call (844) 638-7249 to set it up, and ask about 0% financing for 18 months if the project qualifies. Some homeowners also use the same window of construction to tackle a Small & Partial Kitchen Remodel in Tice in the primary house.

Written by Derek Hollenbeck, Owner at Groundwork Construction Co., serving Tice and greater Lee County since 2014.

Why Tice Chooses Groundwork Construction Co. of Fort Myers

We set the standard for junior adu & interior conversion in Tice.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Tice

Getting your junior adu & interior conversion handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your junior adu & interior conversion needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Tice - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local junior adu & interior conversion pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Tice Customers Say

Trusted by homeowners across Tice and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong · Verified customer
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson · Verified customer
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett · Verified customer

Ready for Junior ADU & Interior Conversion in Tice?

Call now for a free estimate - or request one below. Licensed, insured, and available 24/7 in Tice.

(844) 638-7249

Request a Free Estimate in Tice

Tell us about your junior adu & interior conversion needs - we'll respond within the hour.

When you send us your details, you agree to the terms of our Privacy Policy and consent to being contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Send a Text
Areas We Serve
Call Now - 24/7 Dispatch